APPENDIX F
INSPECTION SCHEDULES
PROJECT ADVENTURE
MAHOPAC MIDDLE SCHOOL
Inside Inspection Schedule
Year _________
| ELEMENT | DATE (By Sept. 30th) |
I N |
DATE (By Jan. 30th | IN |
| 1. Horizontal Wall | ||||
| 2. Climbing Walls | ||||
| Block wall and platform | ||||
| Modular wall | ||||
| 3. Centipede | ||||
| 4. Commando Crawl | ||||
| 5. Flying Squirrel | ||||
| 6. Giant's Ladder |
Each of the following items need to be inspected at each inspection date.
| ELEMENT | Washers & bolts | Rapid links | Belay cable | Rosa Gold Spin Static | Back-up cable | Spring | Dickens bolts |
| 1. Horizontal W. | |||||||
| 2. Block Wall | |||||||
| 3.Modular Wall | |||||||
| 4.Centipede | |||||||
| 5.Commando Cr. | |||||||
| 6. Flying Squ. | |||||||
| 7. Giant's Lad. |